A water infrastructure project consisting of a 37 m deep shaft, together with a 280 m long and 15 m deep detention wall tank that has a 3 different layer of wall thickness.
Working on a confined space with limited assembly area of the 37 m deep shaft are made possible with GRV Articulated Waler Circular Formwork and RCS Rail Climbing systems as it allows fast and safe casting of the circular walls. Furthermore, PERI UP Flex Stair 75 is used in the shaft as it allows comfortable head clearance for the workers to access the access tower.
Location
Main Application
Water Retaining Structures
Project participants
Main Contractor: Lian Soon Construction Pte Ltd
Sub-contractor: Ed. Züblin AG (Singapore Branch)
Sub-contractor: Ed. Züblin AG (Singapore Branch)
The Project
Impressions from the project process
PERI UP Flex Stair 75 are covered with netting for safety.
With a 37 m deep, PERI UP Flex Stair 75 allows comfortable head clearance for the workers to access the access tower.
A section of the RCS Railing Climbing System is seen here on the GRV Articulated Waler Circular Formwork that are being lifted up by a crane to move inside the shaft.
GRV Articulated Waler Circular Formwork systems are seen here at the bottom of the shaft pit.
With minimal tower crane on site, PERI systems are made possible to design the big wall panel around the shaft.
PERI UP Rosett Modular Scaffold are used for the design of the big wall panel.
VARIO GT 24 Girder Wall Formwork can be adapted to suit all geometries and requirements.
Part of the 3 different thickness of the detention wall tank.
An overview of the rectangular detention wall with PERI UP Rosett Modular Scaffold and VARIO GT 24 Column Formwork System.
An upclose view of our PERI systems - VARIO GT 24 Column Formwork.
PERI UP Flex Stair 75 are covered with netting for safety.
With a 37 m deep, PERI UP Flex Stair 75 allows comfortable head clearance for the workers to access the access tower.
A section of the RCS Railing Climbing System is seen here on the GRV Articulated Waler Circular Formwork that are being lifted up by a crane to move inside the shaft.
GRV Articulated Waler Circular Formwork systems are seen here at the bottom of the shaft pit.
With minimal tower crane on site, PERI systems are made possible to design the big wall panel around the shaft.
PERI UP Rosett Modular Scaffold are used for the design of the big wall panel.
VARIO GT 24 Girder Wall Formwork can be adapted to suit all geometries and requirements.
Part of the 3 different thickness of the detention wall tank.
An overview of the rectangular detention wall with PERI UP Rosett Modular Scaffold and VARIO GT 24 Column Formwork System.
An upclose view of our PERI systems - VARIO GT 24 Column Formwork.
Are you working on a project like this?
Contact us – we will be happy to help you.