Located among the buzzingly street in the Central Business District, T225 Shenton Way Station is one of the few upcoming train stations for the Thomson-East Coast Line. It will be a 5-storey underground train station at 40 m below ground level.
DUO are used to cast the 22 m by 5.4 m exterior wall.
Extensions with DUO Panels are possible in 15 cm or 30 cm increment. For extensions over 4.05 m, an additional waler is required at every horizontal connection.
DUO gives an excellent finishes as the concrete hardly sticks to the panels.
DUO are used to cast the 22 m by 5.4 m exterior wall.
Extensions with DUO Panels are possible in 15 cm or 30 cm increment. For extensions over 4.05 m, an additional waler is required at every horizontal connection.
DUO gives an excellent finishes as the concrete hardly sticks to the panels.