Senja / KJE Flyover, Singapore
Senja, Singapore
The new Senja / KJE Flyover will bring motorists traveling between Bukit Panjang and Senja greater accessibility and offer a direct connection via a new road interchange at the expressway. This will connect Senja Road to both bounds of the KJE.
The project commenced in Q1 2018 and is slated to be completed in Q4 2022.
Location
Main Application
Civil Engineering
Project participants
Customer: Quek & Quek Civil Engineering Pte Ltd
The Project
Impressions from the project process
Senja / KJE Flyover under construction - PERI UP Flex Stair 75, lightweight and flexible access solution
PERI UP in use
PERI UP Flex Shoring towers provide a stable base for MULTIFLEX slab formwork
MULTIFLEX Girder Slab Formwork + PERI UP Shoring for slab
GT 24 Formwork Girder provides high load-bearing capacity and rigidity
Utilization of PERI UP at site
Overview of the Senja / KJE Flyover in construction
The proposed Senja / KJE Flyover is expected to be ready by 2022 (Image credit: LTA Singapore)
Artist impression of the new Senja / KJE Flyover (Image credit: hbtbp.sg)
Senja / KJE Flyover under construction - PERI UP Flex Stair 75, lightweight and flexible access solution
PERI UP in use
PERI UP Flex Shoring towers provide a stable base for MULTIFLEX slab formwork
MULTIFLEX Girder Slab Formwork + PERI UP Shoring for slab
GT 24 Formwork Girder provides high load-bearing capacity and rigidity
Utilization of PERI UP at site
Overview of the Senja / KJE Flyover in construction
The proposed Senja / KJE Flyover is expected to be ready by 2022 (Image credit: LTA Singapore)
Artist impression of the new Senja / KJE Flyover (Image credit: hbtbp.sg)