GRV Formwork installation and ready for casting

PERI Singapore Infrastructure Projects

Form structures that stand tall

For over 30 years, we have been involved in delivering some of the Singapore's most complex tunnels, bridges and water chambers. By using modern technology alongside our trusted temporary works systems, we help you deliver infrastructure that is built to last.

PERI Singapore Infrastructure Projects

Find the matching solution for your needs

Show Filter
ST 100 Stacking Tower for casting of the railway platform slab
Singapore T208 Springleaf MRT Station Springleaf is a future underground MRT Station of the new Thomson-East Coast Line in Singapore.
Overview of Y-Shaped Pier Bridge
Singapore Y-Shaped Pier Bridge over Punggol Waterway, Singapore The new bridge aims to support new roads being built from Sentul Crescent to Punggol Seventeenth Avenue, Singapore.
PERI UP Flex provides a 2-in-1 solution for the slab falsework and the perimeter of the train station’s wall access.
Singapore T221 Havelock Station Havelock Station is an underground train station located along the Thomson-East Coast Line.
DUO are used to cast the 22 m by 5.4 m exterior wall.
Singapore T225 Shenton Way Station Shenton Way Station is one of the few upcoming train stations for the Thomson-East Coast Line.
SB Brace Frames and VARIO GT 24 Wall Formwork for casting of walls
Singapore T211 Bright Hill MRT Station Bright Hill is a future underground MRT Station of the new Thomson-East Coast Line in Singapore.
PERI UP Flex are used to cast the internal shear walls of the train station.
Singapore T219 Orchard Station Orchard Station will be an interchange train station connecting both Thomson-East Coast Line and North-South Line.
Overview of assembled GRV Articulated Waler Circular Formwork before casting
Singapore MH-03 Contract 02 Proposed Sewers, Singapore Construction of new sewers in Upper Changi Road East, Singapore.
T226 Marina Bay Station Image l
Singapore T226 Marina Bay Station Marina Bay Station will the new interchange train station that are easily accessible for commuters to commute in the central city area.
The first phase of the construction work with PEP Ergo Props used for supporting loads.
Singapore Jurong Cable Tunnel The deepest bored tunnel connecting mainland to a proposed island substation.
MULTIPROP slab props enable the site to cast beams in a height of 5.10 m and 2.00 m thick slabs
Singapore Sixth Avenue MRT Station The Sixth Avenue is an underground MRT station of the new downtown line in Singapore.
GRV Formwork installation and ready for casting
Singapore Marina Reservoir Chambers, Singapore Singapore water supply network: Marina Reservoir Chambers, Singapore.
Senja / KJE Flyover under construction - PERI UP Flex Stair 75, lightweight and flexible access solution
Singapore Senja / KJE Flyover, Singapore The new Senja / KJE Flyover will bring greater accessibility to motorists in the north-western region of Singapore.
TBM (Tunnel Boring Machine)
Singapore T3003 TBM Platform Advanced Sewer System | Special designed PERI UP platform to supports the TBM (Tunnel Boring Machine).
NDWOB_Startpage
Singapore Water Infrastructure Project A water infrastructure project consisting of a shaft and a detention wall tank.
Regardless whether it is for circular, segmental, basket or other arches – the GRV circular formwork is always a particularly economical solution.
Singapore MH-08 Contract 02 A 30 m vertical underground shaft for one of the proposed sewers project in Singapore.