Paya Lebar Quarter
Paya Lebar, Singapore
Expected Completion Year: second half of 2018 onward
Commercial & Residential Development
Paya Lebar Quarter is an urban mixed-use development compromising of 3 grade A office towers with close to 1 million square feet, a retail mall with over 340,000 square feet and 3 residential towers with 429 apartments which is directly connected to the Paya Lebar MRT Station. It will be a new bustling regional business hub with a peculiar sense of place and cultural identity.
Plot A: Zhang Hui Construction Pte Ltd
Plot B & D: Hexacon Construction Pte Ltd
Plot C (Tower 1): Golden Sands Construction & Engineering Pte Ltd
Plot C (Tower 2): Sin Herh Construction Pte Ltd
Plot C (Tower 3): Jin Guan Pte Ltd
Location
Main Application
Housing and Multi-Storey Buildings
The Project
Impressions from the project process
DUO lightweight formwork was used for the column formwork of the upper storeys.
As the concrete hardly sticks to the panels, these can easily be released from the concrete during striking. This results in excellent surfaces.
An overview of the retail mall construction in Paya Lebar Quarter.
RCS Self-Climbing System & VARIO GT 24 Girder Wall Formwork – A great auto climbing systems for lifts and staircases.
PERI UP Flex with Table Top are used to build up the logistic corridor for vehicle to gain access to transport soil from the basement.
Cantilevers are extended to 2 m height above ground in order to avoid the canal excavation work.
Part of the cantilevers are being lifted up by the crane.
RCS Climbing Rail - The universal steel profile for climbing applications and as a core component in the VARIOKIT Engineering Construction Kit available in lengths from 1.48 m to 9.98 m.
The Climbing Shoe provides the necessary flexibility in order to attach the Climbing Rail with up to ±4° inclinations. Thus,the formwork can also climb over wall offsets.
PD 8 Table System – The cost effective shoring for slab tables and high leg loads.
Just within a few months, with the help of PERI Material Lifter and RCS P Climbing System, the residential building in Plot D shows an escalate progression from 5-Storey to 10-Storey.
An overview of the big scale Paya Lebar Quarter project. Seen here are Plot A at the background while part of Plot C and Plot D in the foreground.
Through the rail guidance, the climbing procedure is fast and safe, even in windy conditions.
PERI VARIOKIT Cantilevers are specially designed by PERI Engineering Team for this project.
An overview of PERI VARIOKIT Cantilevers before the casting stage.
DUO lightweight formwork was used for the column formwork of the upper storeys.
As the concrete hardly sticks to the panels, these can easily be released from the concrete during striking. This results in excellent surfaces.
An overview of the retail mall construction in Paya Lebar Quarter.
RCS Self-Climbing System & VARIO GT 24 Girder Wall Formwork – A great auto climbing systems for lifts and staircases.
PERI UP Flex with Table Top are used to build up the logistic corridor for vehicle to gain access to transport soil from the basement.
Cantilevers are extended to 2 m height above ground in order to avoid the canal excavation work.
Part of the cantilevers are being lifted up by the crane.
RCS Climbing Rail - The universal steel profile for climbing applications and as a core component in the VARIOKIT Engineering Construction Kit available in lengths from 1.48 m to 9.98 m.
The Climbing Shoe provides the necessary flexibility in order to attach the Climbing Rail with up to ±4° inclinations. Thus,the formwork can also climb over wall offsets.
PD 8 Table System – The cost effective shoring for slab tables and high leg loads.
Just within a few months, with the help of PERI Material Lifter and RCS P Climbing System, the residential building in Plot D shows an escalate progression from 5-Storey to 10-Storey.
An overview of the big scale Paya Lebar Quarter project. Seen here are Plot A at the background while part of Plot C and Plot D in the foreground.
Through the rail guidance, the climbing procedure is fast and safe, even in windy conditions.
PERI VARIOKIT Cantilevers are specially designed by PERI Engineering Team for this project.
An overview of PERI VARIOKIT Cantilevers before the casting stage.