The project site serves as a fabrication extension to the developer's existing facility, comprising a three-storey, single-user industrial factory, a five-storey ancillary office, and a single-storey warehouse designed to support expanded operational capacity and enhanced efficiency.
Precast columns were utilized at site. However, cast in-situ solutions were also required.
A range of PERI systems was used to meet both structural and performance demands:
- ST 100 for shoring support
- VARIO Formwork for columns and walls
- CB Climbing Formwork for corewalls and lift cores
PERI Singapore extends our sincere thanks to our valued partner, Soilbuild Construction, for the successful project completion.