Ispring @ 29NIR, Singapore
New Industrial Road, Singapore
Construction is coming to an end at Ispring, a 5-storey (excluding roof & upper roof) single-user industrial development located at 29 New Industrial Road, Singapore. With spacious layouts, the building will host approximately 55 B1 light industrial units.
It was a challenging project for PERI Singapore’s Operations team due to limited material holding space at site. Schedule of the construction progress changes from time to time as well. Materials have to be planned well in advance and delivered on-demand.
PERI Singapore is proud to have worked with our esteemed customer, Soilbuild Construction on this project.
The project commenced in Q3 2023 and is expected to be completed in Q3 2024.
The Project
Impressions from the project process
An overview of the site in progress (January 2024)
ISpring site progress: July 2023
Construction of pilecap and trenches in progress
Ispring site progress: November 2023
Setting up PD8 and PERI UP Tableform for first level casting
Ispring site progress: January 2024
Liftcore with CB Platform, Column Formwork, Tableform Shoring
Ispring site progress: April 2024
Site construction almost in completion
Site crew assembling GT24 Girders for VARIO Column and liftcore panels
PERI UP loose form for cantilever slab and beam
5.5 meters high PERI UP loose form shoring
5 meters high VARIO Wall Formwork for liftcore
An array of PERI systems were utilized for the Ispring project
Setting up PD8 and PERI UP Tableform for first level casting
PERI UP is adaptable to suit almost all geometries and loads ranging from shoring towers to complex load-bearing birdcage structures
DUO is utilized for constructing the water tank walls
Casting height of 6.6 meters
Column height ranging from 5.5 meters to 6.6 meters
VARIO Wallform with climbing bracket was supplied for 8 casting height
DUO was also utilized for the construction of goods lift
Goods lift size of 5.3 x 5.1 meters with a thickness of 0.25 meters
In the process of dismantling PERI UP loose form
Smooth completion of slab and drop panel casting using PERI UP and PD8 Tableform
An overview of the site in progress (January 2024)
ISpring site progress: July 2023
Construction of pilecap and trenches in progress
Ispring site progress: November 2023
Setting up PD8 and PERI UP Tableform for first level casting
Ispring site progress: January 2024
Liftcore with CB Platform, Column Formwork, Tableform Shoring
Ispring site progress: April 2024
Site construction almost in completion
Site crew assembling GT24 Girders for VARIO Column and liftcore panels
PERI UP loose form for cantilever slab and beam
5.5 meters high PERI UP loose form shoring
5 meters high VARIO Wall Formwork for liftcore
An array of PERI systems were utilized for the Ispring project
Setting up PD8 and PERI UP Tableform for first level casting
PERI UP is adaptable to suit almost all geometries and loads ranging from shoring towers to complex load-bearing birdcage structures
DUO is utilized for constructing the water tank walls
Casting height of 6.6 meters
Column height ranging from 5.5 meters to 6.6 meters
VARIO Wallform with climbing bracket was supplied for 8 casting height
DUO was also utilized for the construction of goods lift
Goods lift size of 5.3 x 5.1 meters with a thickness of 0.25 meters
In the process of dismantling PERI UP loose form
Smooth completion of slab and drop panel casting using PERI UP and PD8 Tableform