JTC 9-Storey Light Industrial Building

Project data

Location: Singapore, Singapore

The 9-storey Light Industrial Building is part of the bold and inviting waterfront precinct of Woodlands North Coast. It is a unique mixed-used waterfront destination featuring new homes, exciting job opportunities within a campus-like and porous environment that supports collaboration. Flexible industrial spaces will encourage the co-location of knowledge-intensive and service-oriented activities alongside manufacturing operations. The industrial building will also be having one level of basement carpark, two roof floors and a covered walkway to Republic Polytechnic.

A range of PERI systems were used in this project. The Rail Climbing System (RCS) provided safe and faster climbing even in windy conditions, TRIO wall panels for quicker assembly time due to its large-area shuttering, VARIO GT24 column formwork were used to take high concrete pressures, the DUO lightweight system for manual formwork installation below the bondek slab and i-beam composite columns and PERI UP shoring for quick installation that compliments the high load-bearing of PD8 shoring system. This project consists of a wide array and multiple use of PERI systems, benefitting the customer with efficiency, cost-effectiveness and high productivity.

Requirements

  • VARIO Formwork – For columns
  • PD8 – For slab (Building 1)
  • RCS – For lift core and staircase wall
  • TRIO – For retaining wall
  • DUO – For composite column
  • PERI UP – For slab (Building 2)

Customer

Lum Chang Building Contractors Pte Ltd

Customer's benefit

  • Quick installation
  • Safe and efficient
  • Highly adaptable and flexibility
  • Efficient and cost-saving
Kang Yeong Chern
Assistant Project Manager

Having worked with PERI on a number of top level projects, they have been consistent in providing us with fast and reliable support from all levels of its organization. We have received timely technical and logistical support, supervision assistance from PERI site personnel and was able to overcome any on-site issues to follow through the project within the given time frame.

PERI solution

  • PERI UP shoring that provides efficient, cost-effective and safe assembly
  • TRIO Panel Formwork for a high level of surface evenness
  • VARIO GT 24 for high concrete pressure
  • PD 8 Shoring system to take high loads
  • DUO for manual formwork installation without a use of crane