Project data

Location: New Industrial Road, Singapore

Construction is coming to an end at Ispring, a 5-storey (excluding roof & upper roof) single-user industrial development located at 29 New Industrial Road, Singapore. With spacious layouts, the building will host approximately 55 B1 light industrial units.

It was a challenging project for PERI Singapore’s Operations team due to limited material holding space at site. Schedule of the construction progress changes from time to time as well. Materials have to be planned well in advance and delivered on-demand.

PERI Singapore is proud to have worked with our esteemed customer, Soilbuild Construction on this project.

The project commenced in Q3 2023 and is expected to be completed in Q3 2024.

Requirements

  • Shoring for beam and slab
  • Water tanks
  • Goods lift
  • Liftcore
  • Columns
  • Loading Platform

Customer

Soilbuild Construction Group Ltd

Customer's benefit

PERI UP Flex Shoring – Highly flexible through the uniform grid size. Adaptable to suit almost all geometries and loads.

PD 8 Table System – Large spindle extensions enables quick adaptions to accommodate different slab heights as well as being lowered for moving under large beams.

DUO Universal Formwork – Simple handling and assembly due to the low weight and smart design of DUO’s system components. No extra tools needed.

VARIO GT 24 Girder Wall Formwork - Easily adaptable to suit every size, concreting height and required fresh concrete pressure.

VARIO GT 24 Column Formwork – Easily adaptable to suit every size, concreting height and required fresh concrete pressure.

CB 240/160 Climbing System – The CB climbing system allows fast moving and easy adjustments. The system was used for staircase and corewall.

PERI solution

  • PERI UP Flex Shoring for beam Tableform
  • PD 8 Table System for slab
  • DUO System Formwork for water tanks and goods lift
  • VARIO GT24 Wall Formwork + CB Climbing Formwork for liftcores
  • VARIO GT 24 Column Formwork for 5.5m to 6.6m of casting height
  • Loading Platform supporting up to 3 tonnes of load