DTSS Muck Pit
Benoi Road, Singapore, Singapore
The DTSS Muck Pit is a two-part project situated along Benoi Road, an industrial area within the Western region of Singapore within Jurong Industrial Estate. In the first section, wall columns were required in the muck pit area. The muck pit is built as part of advanced works in the construction site.
In the second section, the round shaft required ring beams as part of early construction works to further dig underground to construct sewerage.
Location
Main Application
Industrial Structures
Project participants
Main Contractor: Ed. Zublin AG, Singapore Branch
The Project
Impressions from the project process
PERI UP for rebar works
PERI UP scaffolding that provides efficient, cost-effective and safe assembly
The TRIO column panels are 90 cm wide in rectangular shape, does not require nailing of chamfer strips due to the clamping mechanism and has a high number of re-uses for cost-effective savings.
Placing the TRIO Panel Formwork for concrete walls
TRIO Panel Formwork for a high level of surface evenness
Perfect finish of the completed concrete walls of the muck pit after TRIO panels are removed
Partial concrete walls of the muck pit with TRIO panels
Assembled GRV Circular Formwork wall panels for the shaft, waiting to be installed
GRV Circular Formwork transferred via crane to the bottom of the shaft
Partial concrete walls of the muck pit with TRIO panels
PERI UP for rebar works
PERI UP scaffolding that provides efficient, cost-effective and safe assembly
The TRIO column panels are 90 cm wide in rectangular shape, does not require nailing of chamfer strips due to the clamping mechanism and has a high number of re-uses for cost-effective savings.
Placing the TRIO Panel Formwork for concrete walls
TRIO Panel Formwork for a high level of surface evenness
Perfect finish of the completed concrete walls of the muck pit after TRIO panels are removed
Partial concrete walls of the muck pit with TRIO panels
Assembled GRV Circular Formwork wall panels for the shaft, waiting to be installed
GRV Circular Formwork transferred via crane to the bottom of the shaft
Partial concrete walls of the muck pit with TRIO panels