XCL World Academy Innovation Hub, Singapore
Yishun, Singapore
XCL World Academy located in Yishun, Singapore is launching an exciting new Innovation Hub within their premises. The new Innovation Hub will consist of 2 blocks, both 5-storey high. It is purpose-designed to enhance the academy’s learning environment with latest technology and specialized labs for its students.
A wide range of PERI systems were used in this project.
The project commenced in Q3 2022 and is slated to be completed in Q1 2024.
Location
Main Application
Building refurbishment
Project participants
Main Contractor: Sunray Woodcraft Construction Pte Ltd
Sub-contractor: Raze Builders Pte Ltd
Sub-contractor: Raze Builders Pte Ltd
The Project
Impressions from the project process
XCL World Academy’s latest Innovation Hub site progress: January 2023
XCL World Academy’s latest Innovation Hub site progress: May 2023
ST 100 loose shoring for 4th storey perimeter beam
PD 8 and ST 100 to suport beam and slab for 3rd storey. Cast ahead-walls using VARIO GT 24 CB 240 climbing brackets and BR Internal Platform with finishing platform.
Striked PD 8 Tableform ready for transfer to next level
Site crew transporting PD 8 Tableform easily with a trolley
PD 8 securely strapped and ready to be lifted
Alternative lifting method without using lifting fork
Ongoing installation of rebar for columns in block F
Securing VARIO GT 24 Girder Column Formwork in preparation for concrete pouring
VARIO GT 24 Girder Wall and Column Formwork and PD 8 Tableform in use
Shiela Quimora (left) and Krizza Rosales (right), our Design Engineers in-charge of the XCL World Academy Innovation Hub project
XCL World Academy’s latest Innovation Hub site progress: January 2023
XCL World Academy’s latest Innovation Hub site progress: May 2023
ST 100 loose shoring for 4th storey perimeter beam
PD 8 and ST 100 to suport beam and slab for 3rd storey. Cast ahead-walls using VARIO GT 24 CB 240 climbing brackets and BR Internal Platform with finishing platform.
Striked PD 8 Tableform ready for transfer to next level
Site crew transporting PD 8 Tableform easily with a trolley
PD 8 securely strapped and ready to be lifted
Alternative lifting method without using lifting fork
Ongoing installation of rebar for columns in block F
Securing VARIO GT 24 Girder Column Formwork in preparation for concrete pouring
VARIO GT 24 Girder Wall and Column Formwork and PD 8 Tableform in use
Shiela Quimora (left) and Krizza Rosales (right), our Design Engineers in-charge of the XCL World Academy Innovation Hub project