project overview page jalan papan 01

Project overview

Use our local experts combined with global capability to make your project a success

We have been delivering projects across all sectors around the world for over 50 years.  Our local experts can combine knowledge of your challenges and needs with our global experience and expertise to overcome any issues on site.

If there is a specific construction or engineering challenge you face, we can deploy our full range of products, services and experience to overcome these and provide the best solution.

Afterall, providing the best service and solution to our customers is what drives us every day.

All Projects

ST 100 Stacking Tower for casting of the railway platform slab
Overview of Y-Shaped Pier Bridge
PERI UP Flex provides a 2-in-1 solution for the slab falsework and the perimeter of the train station’s wall access.
DUO are used to cast the 22 m by 5.4 m exterior wall.
SB Brace Frames and VARIO GT 24 Wall Formwork for casting of walls
PERI UP Flex are used to cast the internal shear walls of the train station.
Overview of assembled GRV Articulated Waler Circular Formwork before casting
T226 Marina Bay Station Image l
The first phase of the construction work with PEP Ergo Props used for supporting loads.
MULTIPROP slab props enable the site to cast beams in a height of 5.10 m and 2.00 m thick slabs
GRV Formwork installation and ready for casting
Senja / KJE Flyover under construction - PERI UP Flex Stair 75, lightweight and flexible access solution
TBM (Tunnel Boring Machine)
VARIO GT Column Formwork was used on these columns achieving smooth concrete finishing.
Singapore Sports Hub Stadium
Site progression - April 2022
XCL World Academy’s latest Innovation Hub site progress: May 2023
An overview of both PD 8 Table and ST 100 Stacking Tower are used on site.
Overview of the brand new Kallang Tennis Centre site
Singapore Chinese Cultural Center
An overview of Tenet EC site: February 2024
Hotel Capella, Sentosa Island, Singapore - The new 6-star hotel complex was constructed around two buildings dating from the colonial times. With SKYDECK, the construction of the reinforced concrete slabs could be carried out efficiently and safely.
Commonwealth Towers
Signature at Yishun
An updated overview of Centrium Square at Serangoon Road
New 2-storey industrial building at Tuas South Link - Boon Tian Factory
Condominuim at St Thomas Walk
PERI UP Rosett and PD 8 Table System are used jointly in the jobsite at the Educational block.
Cost effective shoring system that can be quickly adapted to accommodate different heights for moving under large beams.
Overview of 11.5m casted columns for Bishan Depot Upgrade R1012
The great wall of DUO: DUO used for shear wall
SMUX at Canning Rise
Site progression in December 2020 - 3rd lift of CB Climbing Platform
The GEAR will serve as Kajima Corporation’s Asia Pacific HQ
SAFRA CCK site progress: March 2022
One KA @ Macpherson site progress: August 2023
Overview of Sims Urban Oasis
Overview of Bukit Batok East Community Club
DUO - the universal lightweight formwork for walls, columns and slabs
The project involves the construction of a five-storey 27,000m², 30MW data center. It includes the construction of an office facility, server rooms, administrative space and the installation of electrical and mechanical equipment, safety and security systems, and elevators.
DUO lightweight formwork was used for the column formwork of the upper storeys.
The construction of the liftcores are made possible with CB240 Climbing Formwork system and PD8 Table system seen here are used for the beam.
Overview of Top Pave Project
An overview of the entire jobsite of the JTC 9-Storey Light Industrial Development
Overview of Wave 9 industrial development
Overview of Ascent @ Gambas in May 2023
Kienta Project
An overview of the jobsite with PERI systems.
Overview of Project Spring’s substation
Partial concrete walls of the muck pit with TRIO panels
JTC Chemical Hub
DB Factory at 42A Penjuru Road under construction
Overview - A total of 4 liftcores were required for the project
VARIO GT 24 Column Formwork with VARIO GT 24 Girder Wall Formwork at the background.
Together with PD 8 Table and ST 100 Stacking Tower systems, they are able to cast a 10 m height of slab on the 2nd floor.
Addition and Alteration works for Applied Materials
Utility Block consisting of 4 levels of slab
Nicely arranged PERI UP Rosett Flex with a complete look of the beam.
Large PD 8 Tables are designed to maximize workers' productivity resulting in lesser handling.
Marina Bay Sands, Singapore - The American Las Vegas Sands Corporation is the owner of the complex the highly visible hotel towers.
SBF Center Overview
Overview
RobinsonTower_Startpage
Marina One Project
Overview of Rochester Commons – 17 storey mixed-used tower
NDWOB_Startpage
Regardless whether it is for circular, segmental, basket or other arches – the GRV circular formwork is always a particularly economical solution.
project overview page jalan papan 02

Interested in how PERI can support your next project?

Call +65 6744 2989 to enquire more. Alternatively, submit a contact form below!

Contact form