TBM (Tunnel Boring Machine)

T3003 TBM Platform
East Coast, Singapore

Advanced Sewer System
 
A special designed PERI UP platform supports the TBM (Tunnel Boring Machine) which consists of 3 parts. After the vertical break through it was lowered on a support frame which was located on top of the PERI platform to be disconnected and lifted up by a mobile crane (21 m). The total weight of the TBM was 81 tons.

 

 

Location
Main Application
Civil Engineering
Project participants
Customer: Ed. Züblin AG – Singapore Branch 

The Project

Impressions from the project process
Mr Peerapat Sipongsai | Project Engineer and Mr Jittinong Hitmengsong | Site Engineer
Mr Peerapat Sipongsai | Project Engineer and Mr Jittinong Hitmengsong | Site Engineer
Mr Peerapat Sipongsai | Mr Jittinong Hitmengsong
Project Engineer | Site Engineer
Mantling PERI products is very easy and the quality is very good. The PERI Formwork Instructor being on site is a great benefit for us.