Located adjacently to Singapore’s highly-recognizable premier mall, ION Orchard, T219 Orchard Station will be an interchange train station connecting both Thomson-East Coast Line and North-South Line. It took 2 years of excavation works to complete a 28 m depth below existing ground level of the underground train station. Both PERI UP Flex and DUO systems are used for the construction works for this project.
Main Contractor –
Sub Contractor –
Location
Main Application
Civil Engineering
Project participants
Main Contractor: Penta-Ocean Construction Pte Ltd
Sub-contractor: Interno Engineering (1996), Pte Ltd
Sub-contractor: Interno Engineering (1996), Pte Ltd
The Project
Impressions from the project process
PERI UP Flex are used to cast the internal shear walls of the train station.
Another view of the internal shear wall that used PERI UP Flex.
DUO are used to cast the wall of the narrow small walkway in the train station.
DUO are used for all five entrances of the train station that is located just above ground.
Still in work-in-progress, DUO is seen used for the train station’s wall.
DUO are used with just one time usage within 3 working days.
PERI UP Flex are used to cast the internal shear walls of the train station.
Another view of the internal shear wall that used PERI UP Flex.
DUO are used to cast the wall of the narrow small walkway in the train station.
DUO are used for all five entrances of the train station that is located just above ground.
Still in work-in-progress, DUO is seen used for the train station’s wall.
DUO are used with just one time usage within 3 working days.