PERI UP Flex Reinforcement Scaffolding in action
-
Save time through simplicity
A modular system, easy to handle and install, with high factors of safety, make PERI UP reinforcement an easy partner on your project
-
Easy to move, even in larger units
The Bracing Scaffold can be moved by crane in larger units to improve site efficiency
-
Safety as standard
All PERI UP solutions feature built-in safety features such as the gravity lock and integrated toeboards. With high factors of safety, ample working space and a stable working platform, workers can focus on the job in hand with peace of mind
-
Stable
Ballast and anchors are not required.
Product Data Sheet
Scaffold type
Reinforcement Framework
Type of use
Working scaffold up to load class 3 (200kg/m²)
Width class
SW 03, SW 06, SW 09, SW 12, SW 15
Load class
LK 1, LK 2, LK 3, LK 4, LK 5, LK 6
Design width
75cm, 100cm
Body heights
Up to 10.80 meters
Scaffolding grid
Metric
Type of pavement
Steel
Structure principle
Advance assembly in the system according to TRBS 2121-1 possible
Body length
1 field, 2 fields, 3 fields
Field length
150 cm, 200 cm, 250 cm, 300 cm
Base width
150 cm, 200 cm
Compatible with
PERI UP scaffolding kit
Interested in using PERI UP for your project?
Contact us – we will be happy to help you.